Small Hydroelectric Power Plant Turnkey Anywhere in the World
Experience: 35 years in the industry.
Capacity of the finished plant: from 1 MW to 60 MW.
Project implementation time: from 12 to 24 months.
Average cost: €2,500,000 per 1 MW of installed capacity.
Operational life without major repairs: up to 60 years.
43 small hydroelectric plants worldwide in 35 years
Assessments, design, manufacturing, installation, and general contracting under one roof.
Fast and cost-effective turnkey construction
Leave all the concerns about organizing the construction of a small hydroelectric power plant to us:
  • Technical (assessments, design, manufacturing)
  • Legal (approvals)
  • Construction
We have developed a range of 35 types of hydro units for any conditions, so you can use the technologies we have already developed. This allows us to quickly design and start production of your future small hydroelectric plant without needing to invent new solutions for each case, significantly reducing the time to get a finished product.

We will handle the legal and construction aspects—approving the plant according to the regulations of the host country and building the facility with our own resources.

You will be able to interact with us through a "single window" without the markup of a third-party general contractor and communication issues between different organizations. The construction process will be as straightforward as possible for this type of project.
Parameters of our small hydroelectric plants
Power
Electricity generation from 1 MW to 60 MW per hour.
Cost
On average, €2,500,000 per 1 MW of installed capacity.
Operation
Automated plants; no operational staff required.
Construction Time
From 12 to 24 months project implementation time.
Operational Life
Up to 60 years without major repairs.
Maintenance
Monthly maintenance by an electrician.
Stages of creating your small hydroelectric plant
and financing structure
1 Week
1 Week
River Assessment
We conduct a site assessment of the river for the installation of the small hydro plant. We determine the possible parameters for the future plant (capacity, type of hydro units). If you don’t have a specific site, we can help you choose one.
Prepayment from €25,000.
1-3 Months
1-3 Months
Designing
Designing the small hydro plant—integrating the plant with selected parameters to the site, in accordance with local legislation.
Prepayment for design work.
1-8 Months
1-8 Months
Regulatory Approval
Approval of all necessary regulatory aspects with local authorities.
3-18 Months
3-18 Months
Component Manufacturing
Starting the production of hydro units and automated control systems for your future plant. The timeframe depends on the type of components chosen and production load.
Staged prepayment.
1-3 Months
1-3 Months
Construction and Installation
Carrying out construction work at the installation site, preparing the site.
Installation of finished hydro units.
Prepayment for construction and installation work.
1-2 Days
1-2 Days
Commissioning and Operational Mode
Commissioning the small hydro plant.
Starting up into full operational mode.
Your plant operates in optimal technical and economic conditions.
Final payment: 10% of the total project cost.
Contact me to discuss the details of your project
Dmitry Timoshenkov,
Partner for Global Market Development
Phone: +90 506 474 80 21
Whatsapp, Viber: +7 953 586 56 26
Telegram: Dmitriy_Ti
Email: ds@hydroplant.tech
Contact us
Telegram
WhatsApp
Mail
Phone