Comprehensive Power Supply for Mining Turnkey Anywhere in the World
We will build a hydropower plant, substation, protection and stabilization systems, and correctly configure energy systems for your microprocessor equipment anywhere in the world.
Experience: 35 years.
Capacity: from 100 kW to 60 MW.
Project implementation time: from 12 to 24 months.
Cost: from €3,200,000 per 1 MW of installed capacity.
Operational lifespan without major repairs: up to 60 years.
We have completed surveys (100+) of rivers with known hydropower plant parameters for installation.
Especially in mountainous regions of Russia and CIS countries.
Total available for installation: 400 MW.
This allows us to quickly organize power generation for you.
300 hydropower plants worldwide in 35 years
Surveys, design, production, installation, and general contracting under one roof
Fast and Cost-Effective Turnkey Construction
Leave all concerns about organizing the construction of your energy system to us:
  • Construction of small hydropower plants
  • Construction of substations with all necessary protection and voltage stabilization measures
  • System configuration for the safe operation of microprocessor devices
We handle:
  • Technical (surveys, design, production)
  • Legal (approvals)
  • Construction
  • Commissioning and installation
  • Technical maintenance

We have developed a range of 35 types of hydro units for various conditions, so you can use our already developed technologies. This allows for rapid design and production of your future hydropower plant without needing to create new solutions for each case.

We will manage the legal and construction aspects – we will approve the hydropower plant and substation according to the regulations of the host country and build the facility with our own resources.

We have developed devices for protecting and stabilizing the energy system, as well as a series of scientific and practical methods for stabilizing microprocessor devices. We know how to ensure that your equipment operates longer without interference and adverse physical processes in the energy system.

You will be able to interact with us through a "single window" without additional charges from external general contractors and without communication problems between different organizations. The process of constructing the energy system will be as simple as possible for this type of project.
The parameters of our power systems
Capacity
Power generation from 100 kW to 60 MW per hour.
Cost
From €3,200,000 per 1 MW of installed capacity.
Operation
Automated stations; no operational personnel required.
Construction Time
From 12 to 24 months for project implementation.
Operational Lifespan
Up to 60 years without major repairs.
Maintenance
Monthly by an electrical technician.
Electromagnetic Environment and Compatibility
Properly configured electromagnetic environment and compatibility of microprocessor devices with the energy system.
Process Safety
The energy system configuration is designed to ensure that all processes within the system are safe for people and equipment.
Stages of creating your small hydroelectric plant
and financing structure
1 Week
1 Week
River Assessment
We conduct a site assessment of the river for the installation of the small hydro plant. We determine the possible parameters for the future plant (capacity, type of hydro units). If you don’t have a specific site, we can help you choose one.
Prepayment from €25,000.
1-3 Months
1-3 Months
Designing
Designing the small hydro plant—integrating the plant with selected parameters to the site, in accordance with local legislation.
Prepayment for design work.
1-8 Months
1-8 Months
Regulatory Approval
Approval of all necessary regulatory aspects with local authorities.
3-18 Months
3-18 Months
Component Manufacturing
Starting the production of hydro units and automated control systems for your future plant. The timeframe depends on the type of components chosen and production load.
Staged prepayment.
1-3 Months
1-3 Months
Construction and Installation
Carrying out construction work at the installation site, preparing the site.
Installation of finished hydro units.
Prepayment for construction and installation work.
1-2 Days
1-2 Days
Commissioning and Operational Mode
Commissioning the small hydro plant.
Starting up into full operational mode.
Your plant operates in optimal technical and economic conditions.
Final payment: 10% of the total project cost.
Contact me to discuss the details of your project
Dmitry Timoshenkov,
Partner for Global Market Development
Phone: +90 506 474 80 21
Whatsapp, Viber: +7 953 586 56 26
Telegram: Dmitriy_Ti
Email: ds@hydroplant.tech
Contact us
Telegram
WhatsApp
Mail
Phone